...............................................................................................................................................................................................................................
Main uses
.....................................................
Solar cells, contacts, electronic circuits repairs kit.
Hardness .....................................................
Soft / Hard / 1/2 Hard
Manufacturing's rules .....................................................
Particular customer's specification or this technical data sheet.
Packaging .....................................................
To see enclosed pictures with models.
Bare Copper Flat Wire Tolerances .....................................................
Thickness: +/- 10% of the nominal thickness.
(Ex. 0.10 +/- 0.01 * 0.30 +/- 0.03
Width .....................................................
From 1.00 mm. to 3.00 mm. +/- 0.10 mm.
From 3.01 mm. to 5.00 mm. +/- 0.20 mm.
From 5.01 mm. to 6.00 mm. +/- 0.25 mm. Camber: máx 12.7 mm. in 914 mm. (regular 3-6 mm in 1000 mm).
Manufacturing's magnitudes
.....................................................
Min Thickness: 0.04 mm.
Max Thickness: 0.60 mm.
Min Width: 1.00 mm.
Max Width: 6.00 mm.
We can produce other dimensions only under consult.
Thickness Plated
.....................................................
Regular 10-15 microns per side
Regular 16-22 microns per side
Regular 30-50 microns per side
We can produce other dimensions only under consult.
Plated Chemical Composition
.....................................................
Regular
Sn (tin) 60% / Pb (lead) 40%
Sn (tin) 96.5% / Ag (Silver) 3.5%
Sn (tin) 62% / Pb (lead) 36% / Ag (Silver) 2% -- (LOWER FUSION POINT)
Sn (tin) 63% / Pb (lead) 37%
Only Sn 100%
(Copper up to 1.50% / other requirements)
Others.
Sn 70 / Pb 30
Sn 80 / Pb 20
Sn 50 / Pb 50
Only Sn
Only Sn (Copper < 1.50%)
We can produce other chemical mix only under consult.
Normal period of delivery
.....................................................
21 days depending on the available production and the measures apply for.
|